Feb 20-21, Green River Summit

Thanks to all who attended and made the Green River Summit a huge success!

Resources

Green River Watershed Section 729 Initial Watershed Assessment

Review plan posted for the Green and Barren Disposition Study -   Green River Locks and Dams 3 4 5 and 6 And Barren River Lock and Dam 1 Disposition Study- Final Web version 24 October 2013

Link to full US Army Corps of Engineers Disposition Study Draft Report

Summit Presentations

2014 Green River Summit Tonning and Edelen septic talk

Mark Philips – Data Collection – Forecasting and Analysis

Elaine Wilson – Ecotourism

Richie Kessler – Green Tapestry

Russell Clark – Using the Green To Make Green While Staying Green

Maps

Map – Upper Green Watershed

Map – Lower & Middle Green, Pond, & Rough Watersheds

Map – Barren Watershed

This slideshow requires JavaScript.

 

The Summit was held at Mammoth Cave National Park, Ky., February 20-21, 2014.

What? Peers, government agencies and experts shared ideas and built synergy around protecting this incredible biodiverse treasure to Kentucky and the nation.

Who attended? Organizations, agencies, and interested individuals with a stake in the health of the Green River.

Organizers: US Army Corp of Engineers, The Nature Conservancy, and Kentucky Waterways Alliance.

COE logo  TNC logo  KWA small

Private Cave Tour: The Mammoth Cave staff generously offered to host the Green River Summit attendees on a private tour Thursday evening.  

Learn more about the presenters here.

Registration for this event is closed.